Contact us to schedule a seminar in your area.
Free, Earn PDH
Newsletter Archive
July 1, 2014
Recently the Georgia Environmental Protection Division (EPD) notified the Georgia Department of Transportation (GDOT) that silt fence check dams installed in ditches and arranged in either upstream V shapes or W shapes (as shown on GDOT Construction Detail D-24D), should no longer be used… More »
In order to evaluate the sediment control performance between various sediment control barriers, these practices must be subject to the same standardized testing procedure or evaluated in controlled side-by-side testing. Recent testing conducted at TRI Laboratory does both. More »